Replacement Of Main Engine Exhaust
Compensator.
 
Replacement Of Shafts,
Mechanical Seals &
Bearings Of Sea
Water Pump.
 
Cutting Of Ship’s Name.
 
Dismantling Of Turbo
Charger.
     
Replacement Of Damaged Railings.
 
Renewal/Installation Of
Damaged Bilged Pipes.
 
Overhaul Main Engine Cylinder.
 
Modification & Installation Of Lube Oil System.
     
Modification Of Foremast During Port Stay.
 
New Soot Blower Installing & Welding On-board Vessel During Port Stay.
 
Installation Of Monorail
Crane Boom During Container Operation.
 
Electric Motor - Rewinding Or Overhauling.
     
Reconditioned Piston
Crown.
 
Replacement Of Sea
Water Outward Pipe.
 
Dismantling Of Sea Water Pump For Repair.
 
Repair Of Sea Water Pipe.
     
Thermal Insulation Work.
 
Installation Of Container Shoe - New During Port Stay.
 
Repair Work Undertaken For Main Engine.
 
Repair Of Auxiliary Engine.
     
Renewal Of Damaged
Railing & Platform During Port Stay.
 
Modification & Installation Of Lube Oil System During Port Stay.
 
Modification Of Piping
System For Base Oil Tank & Oil Base Mud Tank.
 
Bilge Pipe Renewal And
Installation On-board
Vessel During Port Stay.
   
 
     
No.12 Tuas Road S(638486)  |  Tel: (65) 6274 7890  |  Fax: (65) 6272 1528  |  Email: singapore@plurotech.com.sg